Your pour date is a deadline. See what must be decided by when – for your build.
Enter your slab pour date and tell us where each heating decision stands. You'll get your personal schedule – which windows are still open, which are closing, and which decisions are about to be set in concrete. Free, 2 minutes, modelled estimates.
Your build, on the clock
Whose build is it?
The date the concrete goes down. Everything on the list below has to be decided before it – so this date is the deadline that matters.
Where does each heating decision stand?
Be honest – if nobody has shown you the decision in writing, count it as not started. These are the five decisions that decide whether the system runs cheap or expensive for the life of the house.
The rough size of the heated area, in square metres – estimate if you're not sure.
Enter your pour date, or tick "I don't have a pour date yet".
Your full schedule is ready.
Enter your email and it unlocks below – your decisions in calendar order, dated against your pour date, with the windows that are already tight. We'll also send it to you in writing.
Please check your email address – it needs an @ and a domain, like name@example.com.
We'll send your schedule, then a few short emails from Phil on getting your heating right. Unsubscribe anytime · Privacy
Not sure yet? The Thermal Risk Scan checks each of these decisions for the specific risk it carries – free, 2 minutes.
Not giving us your email? Fair enough – here's what the Comfort Guarantee Roadmap does →
Modelled estimate, not a quote or a promise. Cost figures are Euroheat engineering estimates per heating month, using the same rates as our Thermal Risk Scan – your actual impact depends on your specific home, design, and energy use. These figures exist to show the order of magnitude of what an unresolved decision can cost; they are never something we guarantee. The "lock by" dates and week markers are typical, drawn from a 12-week engineering window, and are guidance rather than a schedule.