5-minute quote →5-min quoteQuote
For builders · Perth & south-west, Western Australia

The pour date is your deadline. Get the heating decided before it.

Slab detail, screed depth, thermal breaks and heat pump siting – specified in writing before your concreter quotes, installed by our own crew, commissioned and covered by The Comfort Guarantee. When the owner rings two winters after handover, the heating call comes to us, not you.

Free to quote · same price as anyone · no plans needed to start

A Euroheat installer laying hydronic pipe loops across a residential slab before the pour, Perth new build

Pipe loops going down before the pour. After the concrete, nothing in this picture can be changed.

What we hear from builders

The issues that come up when engineering isn't done early.

"The heat pump can't go where the plans say"

When siting hasn't been designed early, the heat pump ends up boxed in with no airflow – and it can lose up to half its efficiency for the life of the building. We site it properly before your walls go up.

"The screed detail changed at the last minute"

Thermal break specification and screed thickness affect every other trade. We lock the specification early and provide clear callouts for your subfloor team – no surprises at the pour.

"The owner says the system isn't working"

When a floor heating system underperforms, the call lands with the builder. The Comfort Guarantee means that if there's a performance issue, it comes back to us – not to you.

Hand-drawn sketch: on the left three tradesmen point at each other outside a cold house while the owner scratches his head; on the right one team shakes hands outside a warm house.
When three trades built the heating, each points at the next and the owner rings you; when one team designed and built all of it, the call comes to us.
A real example

What no design looks like, halfway through a $5 million build.

A real case from our files. Told as it happened; where a name is changed, we say so.

George is a Perth builder (name changed). Halfway through a ~$5 million house on the Swan River, the geothermal heating and cooling his client wanted from the start was with a company that used all the right words. Fourteen months in, he fired them. When we arrived on site, the design for a $429,000 system was a few emails and some coloured lines drawn over a PDF site plan.

Our calculations found the bore-field undersized by 41%, and seven heat pumps where one or two were needed. Salvaging what could be salvaged cost the owner $90,000 on top of the original contract – and some of the efficiency loss is permanent.

The aircon was the only part done right. Because that subcontractor had done his planning.

Stage by stage

What you get in writing, and when.

We're not a supply-only trade. We design and install end to end, which means we're responsible for the outcome – not just the pipe.

Hand-drawn bar chart of a build programme: the engineering bar ends exactly at the line marked by the concrete truck, and every other trade's bar starts after it.
On a heated slab the engineering has to be finished by the time the truck arrives; everything after the pour builds on top of it.
  1. Pre-design: slab and screed specificationClear written specification for the heating-related slab detail: insulation type and location, screed depth, thermal break callout at edges and junctions. Ready for your concreter and subfloor sub to quote against before the pour.
  2. Pre-design: heat pump sitingWe tell you exactly where the heat pump needs to go – minimum clearances, airflow direction, any coordination with other services. Locked before your walls are built, not retrofitted after.
  3. First fix: pipe and manifoldWe lay the pipe to our design and install the manifold. Your team pours after we've signed off the layout. Everything is photographed and documented as installed.
  4. Commissioning and handoverWe commission the system before handover – bring it up to its operating level, check everything works properly, balance the zones and tune the controls to the slab's heat-up characteristics – and then hand it over. The owner gets a system that works from day one, not one that needs six months of adjustment.
  5. If there's ever an issueThe Comfort Guarantee means performance issues come back to Euroheat, to resolve at our cost. The heating's performance risk sits with us.

For your build record: load calculations, the as-installed pipe layout and the heat pump specification – and a system that can be serviced and rebalanced after handover without breaking the slab.

Free builder pack

Before the Pour: every hydronic answer your site needs.

The stage-gate questions that keep a hydronic job off your defects list – and off your phone two winters after handover. What must be answered in writing at design sign-off, pre-slab, pre-frame and commissioning, with the NCC callouts for heated slabs drawn out. The printable site checklist for your site manager comes with it as the working annex.

Before the Pour – the builder pack

The $110,000 lesson, the four stage gates, the NCC heated-slab callouts, the risk transfer – and the Builder's Pre-Installation Checklist included as the working site annex. Free, straight to your inbox.

Get the pack →

Got a live job with a pour date? Run it through the Slab Pour Deadline Checker → to see which heating decisions are already inside their closing window.

Got a job with floor heating on it? Send it through and we'll price it.

Tell us about the job in about five minutes and we'll send you a written quote with a few options you can put in front of your client. Quotes are free, and you pay the same price as anyone else. With it comes a one-page note you can pass on, explaining why our number may be higher than the plumber's and what the difference buys. Not ready for a price? Start with the free pack.

Perth & south-west WA · new builds and existing homes