For Builders →
Free builder pack · Perth & south-west, Western Australia

Before the Pour: Every Hydronic Answer Your Site Needs – So the Job Never Comes Back on You

The call comes six months after handover: the heating has run day and night for three weeks, the slab is barely warm, and the first winter power bill has just arrived. The plumber followed the drawings; the equipment runs to spec; the number the owner kept is the builder's. This pack is the stage-gate questions that keep that call from ever being yours – what must be answered at design sign-off, pre-slab, pre-frame and commissioning, in writing, while fixing it still costs nothing. Enter your email and read it straight away.

  • The $110,000 lesson – the WA house where architect, builder and plumber all wore a lawsuit, and the design-stage omissions that caused it.
  • The four stage gates – every question that must have a written answer before your pour date closes it forever.
  • The NCC callouts – slab-edge insulation, heated-slab thickness and the floor-rated insulation spec, citable and drawn.
  • The risk transfer – how one accountable contractor with The Comfort Guarantee moves the two-winters-later phone call off your desk.
  • The working site checklist – the printable pre-installation sequence for your site manager.
Hydronic pipe loops laid and pressure-tested on a Perth slab before the pour

Pipe down, pressure-tested, signed off – a slab that is actually ready for the truck

No spam. The pack opens straight away and we'll email you the PDF copy – then occasionally something genuinely useful for builders running hydronic jobs. Unsubscribe any time · Privacy

Opening the pack now.

Open the pack →