Preparation Checklist
Hydronic floor heating installation has a hard dependency on the build sequence. Unlike most trades, there are two moments in the floor heating process that can't be rescheduled once they start: the pipe lay and the pour. If site access, subfloor preparation, or services coordination isn't right before either of those points, the whole schedule slips.
This checklist is split by build stage. Work through it in sequence. Anything marked Euroheat to confirm needs us signed off before you proceed – check it with your Euroheat contact on the job if you're unsure.
This checklist is the working site annex of Before the Pour – the free builder pack that explains why each of these items exists, with the stage-gate questions, the heated-slab callouts (NCC 2022 and AS 2870), and the $110,000 story of what happens when nobody asks them. Get the full pack here →
Design confirmation – before the slab pour
Subfloor preparation – before pipe lay
-
Note
Thermal breaks at wall junctions must be installed by the framing contractor, not Euroheat. Confirm with your framing sub that edge foam/break material is installed at the perimeter of every heated zone before we arrive.
Services coordination – before pipe lay
Pipe lay and pour sign-off
Commissioning and handover
Questions about your project?
If anything on this checklist doesn't apply cleanly to your build, or you're unsure of a sequencing question, reach out before the pour. Getting it right costs nothing. Getting it wrong after the pour costs a lot.
The Roadmap for your client →